| • |
CWS Milk Group: ~ specifications and installation
supervision for new Chilled Water plants. Specification &
installation supervision for modification of existing ammonia
Chilled Water Systems |
| • |
M.C Holdings:~ (Frozen vegetable factory) System design
and assistance with specialist equipment for large new Frozen
Vegetable Factory (approx 1000kW) in Tiblisi Georgia
|
| • |
Anglia Regional Co-op Society: ~ Dairy Milk Intake Chiller
using Hallscrew compressor and secondary refrigerant circuit.
Maintenance & updating of store refrigeration drawings
and auditing of refrigeration contractors. |
| • |
Lincoln Co-Op:~ Specification for modification of existing
ammonia chilled water systems. Specification & Installation
supervision for extensions to ammonia chilled water system.
|
| • |
Nestle:~ Investigation of, and recommendations for solving
problems with blast cooling tunnels
at one of their manufacturing facilities |
| • |
Satchwell Facilities Maintenance:~ Investigation into problems
with a chilled water system in an underground military computer
centre |
| • |
Woodhead Bakers:~ Investigations into problems with spiral
chiller plant |
| • |
Ipswich Co-operative Society:~ Specification & installation
supervision for new Chilled Water plants and for modification
of existing Chilled Water Systems |